RACV NoosaBin Enclosure Upgrade

A civil upgrade delivering expanded, compliant bin storage at RACV Noosa resort

Completed bin enclosure at RACV Noosa - aluminium louvre fencing and gates with tropical resort setting
Project overview

From inadequate enclosure to a purpose-built facility

RenewCORP, as O&M facilities manager for RACV Noosa, identified the need to upgrade the resort's bin enclosure to meet operational and compliance requirements. The project involved demolishing and reconstructing the enclosure with a new concrete slab, retaining wall, reinstated fencing, and a new aluminium access gate - expanding bin capacity and improving site amenity. Works were carefully staged and coordinated to avoid disruption to the operating resort.

4
Weeks total programme
18-20
Bins housed
2
Site mobilisations
0
Operational disruptions
The challenge

Staging civil works around an operating resort

Delivering construction works within a live resort environment required careful planning, clear communication with the client, and a programme structured around both concrete curing requirements and resort operations.

  • Existing bin enclosure was inadequate for the resort's operational requirements
  • Works required staging due to concrete curing constraints, extending the programme across multiple site mobilisations
  • Temporary relocation of bins during works needed to be coordinated with resort operations to avoid disruption
  • Remote Queensland location required careful logistical planning, including accommodation for the return retaining wall phase
  • Supplier lead times for the aluminium pool-style gate required a temporary access solution to maintain site security
Our approach

Staged, communicated and delivered.

Site preparation

  • Initial site mobilisation on 16 February 2026
  • Existing fencing around the bin enclosure removed
  • Bins temporarily relocated by RACV staff to allow safe access and unobstructed works
  • Preliminary preparation completed ahead of the concrete phase

Concrete works

  • Excavation and formwork completed 17 February
  • Concrete slab poured, placed and finished 18-19 February
  • 7-10 day curing period observed prior to loading and commencement of retaining wall works
  • Detailed site progress photos provided to RACV stakeholders throughout

Retaining wall

  • Second mobilisation on 2 March, with team accommodated on-site at the resort
  • Retaining wall works progressed over four days (2-6 March)
  • Works completed to programme with no reported weather or access delays

Reinstatement and access

  • Existing fencing panels and gates reinstated on completion of structural works
  • Temporary Colorbond gate (approx. 1,400 mm wide) installed to maintain security during gate lead time
  • Final aluminium pool-style gate installed week of 9-10 March, completing the scope
Client & partner collaboration

Delivered together

RACV Noosa Resort

RACV Noosa

RACV Noosa is a premier resort and holiday destination on Queensland's Sunshine Coast. RenewCORP serves as their O&M facilities manager, providing ongoing operational support and coordinating capital and maintenance works across the property.

T
Tarcoll

Tarcoll

Tarcoll is a specialist civil and concreting contractor engaged by RenewCORP to deliver the concrete and retaining wall works. Their expertise in civil construction enabled the works to be completed on programme and to specification.

The outcome

A purpose-built enclosure, delivered on time

  • New concrete slab poured, finished and cured to specification
  • Retaining wall constructed across a 4-day programme
  • Existing fencing panels reinstated following completion of structural works
  • New aluminium pool-style gate installed, replacing the temporary Colorbond gate
  • Bin enclosure capacity expanded to accommodate 18-20 bins depending on configuration
  • Works completed with no reported disruption to resort operations
Project gallery
Bins temporarily relocated at start of works
Site cordoned off following fence removal
Excavated area prepared for concrete works
Construction site overview during works
Freshly poured and finished concrete slab during curing
Retaining wall works in progress
Completed enclosure interior showing concrete slab
Completed enclosure gates open showing access
Gate hardware detail on completed aluminium gate
Aerial view of bins loaded into completed enclosure
Bins loaded into the completed enclosure
Bins inside enclosure viewed from gate

This project reflects RenewCORP's ability to deliver civil works within live, operational environments - coordinating trades, managing logistics across remote sites, and maintaining clear communication with clients throughout.