Case studyEducationDesign & construct

Aspect Hunter SchoolBasketball Court

Complete court redevelopment in a live school environment

The completed basketball court at Aspect Hunter School - deep blue surface, white line marking and a covered structure over the full playing area
Project overview

A rebuild, not a resurface

Aspect Hunter School needed its basketball court rebuilt. The brief called for a new concrete base, a covered structure over the playing area, a hoop set up to a proper competition standard, edge protection around the perimeter, and a floor finish with genuine visual impact rather than a plain grey slab.

All of it had to be delivered while the school remained open and operating.

Client
Autism Spectrum Australia (Aspect), Hunter School
Location
3 Kooralbyn Street, Thornton NSW 2322
Sector
Special needs education, live operating school
Completed
31 July 2026
Delivered by
RenewCORP Pty Ltd, with specialist structural, fencing and line marking subcontractors
Scope delivered

Base, cover, hoop and finish

  • Preparation and pour of a new concrete base for the court
  • Installation of a new covered structure over the full playing area
  • Installation of an engineered, pro-spec basketball hoop
  • Edge protection fitted around the court perimeter for student safety
  • Colour base court coating in deep blue for a bold, game-ready finish
  • Full white line marking to Australian Standards
Deep blue court surface and white line marking under the new covered structure
The court from the corner, showing the arched cover, both backboards and the surrounding trees
The covered court from the sideline, with edge protection running along the perimeter
Our approach

Sequenced around a working school

New concrete base

The brief called for a rebuild rather than a resurface, so the court starts from a new slab rather than a patched one.

  • Preparation of the court area ahead of the pour
  • New concrete base laid across the full playing area
  • A level, durable platform for the coating and line marking that follow

Covered structure

  • New covered structure installed over the full playing area
  • All-weather use through the school year, and shade through summer
  • Erected over a live campus with the court area sequenced and segregated

Court finish and line marking

  • Colour base court coating in deep blue rather than a plain grey slab
  • Full white line marking set out to Australian Standards
  • Engineered, pro-spec hoop installed to a proper competition standard

Safety and edge protection

  • Edge protection fitted around the court perimeter
  • Work zones staged and segregated from student areas
  • Ongoing coordination with school staff around the daily routine
Live environment delivery

Built while the school stayed open

The works were staged around the school calendar and day-to-day operations, keeping the site safe and functional throughout construction.

Coordinating a concrete pour, a structural build and finishing trades on an active campus for students on the autism spectrum meant sequencing work carefully and keeping disruption to routine as low as possible.

The result

A purpose-built facility the school owns

  • A covered, all-weather structure over a new concrete base
  • A competition-standard hoop set up for genuine play
  • Edge protection around the perimeter for student safety
  • A deep blue playing surface with crisp white line marking to Australian Standards
  • A facility the school owns outright, built to be used every day for years to come
Full court length under the curved cover, looking towards the far hoop

A second project delivered for Aspect Hunter School, on the same campus and to the same standard: coordinated trades, student safety ahead of programme, and an asset built to last.